Skip to Main Content
Loading
Close
Loading
About Us
Divisions
Resources
I Want To...
Home
Form Center
Form Center
Search Forms:
Search Forms
Select a Category
All Categories
Above Ground Storage Tanks
Boilers
Certificate Requests
Contact
Elevators
Emergency Response
Extinguishers, Alarms, & Sprinklers
Facilities
Fire Prevention Education
Fireworks
Get Alarmed KS
Healthcare
Industrial Hemp Processing
Insurance
Investigations
Kansas Open Records Act Request Forms
Lending Library
National Fire Incident Reporting System Training
Propane
Tom McGaughey Fire Service Award
By
signing in or creating an account
, some fields will auto-populate with your information and your submitted forms will be saved and accessible to you.
Report of Inspection, Testing, & Maintenance of Dry Pipe Sprinkler System
Sign in to Save Progress
This form has been modified since it was saved. Please review all fields before submitting.
Inspector Name
Date
Inspection Frequency
Monthly
Quarterly
Annually
Weekly
Inspection of Dry Pipe Sprinkler System
1.0 System in service on inspection
-- Select One --
Yes
No
N/A
1.1 System (water) gauge pressure
1.2 System (air) gauge pressure
1.3 Quick opening device gauge pressure
1.4 Gauge near compressor
1.5 Gauge pressures are normal
-- Select One --
Yes
No
N/A
2.0 Control Valves in normal open or closed position
-- Select One --
Yes
No
N/A
2.1 Control Valves properly locked or supervised
-- Select One --
Yes
No
N/A
2.2 Control valves accessible
-- Select One --
Yes
No
N/A
2.3 Control valves with appropriate wrenches
-- Select One --
Yes
No
N/A
2.4 Control Valves free from external leaks
-- Select One --
Yes
No
N/A
2.5 Control valves identification signs in place
-- Select One --
Yes
No
N/A
2.6 System control valve sign indicated area served
-- Select One --
Yes
No
N/A
3.0 Backflow prevention assembly valves are locked or electrically supervised in open position
-- Select One --
Yes
No
N/A
3.1 Reduced pressure backflow prevention assembly not in continuous discharge
-- Select One --
Yes
No
N/A
4.0 Dry pipe valve free of physical damage
-- Select One --
Yes
No
N/A
4.1 Dry pipe valve trim valves are in appropriate or closed position
-- Select One --
Yes
No
N/A
4.2 Dry pipe valve intermediate chamber not leaking
-- Select One --
Yes
No
N/A
5.0 Alarm panel clear
-- Select One --
Yes
No
N/A
6.0 Comments
Leave This Blank:
Receive an email copy of this form.
Email address
This field is not part of the form submission.
Submit
* indicates a required field
Accessibility Policy
Contact Webmaster
Terms of Use
Press Releases
Arrow Left
Arrow Right
[]
Slideshow Left Arrow
Slideshow Right Arrow